Rental Space
Park Main Buildings
EECi Headquarters – Buildings A, B, C, D, E and F
- Total cooling capacity =560 tons (refrigeration)
- Total electricity capacity = 2,000 kVA
- Fire alarm and sprinkler systems covering all areas
- Total water capacity = 100 cubic meters/day
Room Type | Size | Specifications |
---|---|---|
Office | Building B160 sq.m/roomNumber of room : 1Building C210 – 250 sq.m/roomNumber of room : 2160 sq.m/roomNumber of room : 175-100 sq.m/roomNumber of room : 6Building D70 sq.m/roomNumber of room : 8Building F12 sq.m/roomNumber of room : 8 | Ceiling height = 3.5 mRubber floorLive floor load = 300 kg/sq.m |
Wet Lab | Building F77 sq.m/ModuleEach module has Wet Lab : 60 sq.mOffice Space : 17 sq.m | First floor ceiling height = 4.05 mSecond floor ceiling height = 4.55 mPolished floor (wet lab area)Antistatic flooring tiles (office area in each module)Live floor load = 500 kg/sq.mNormal electricity load ~ 3 Phase 40A (with kWh meter)Essential electricity load ~ 3 Phase 32A (with kWh meter)Grounding systemData outlet |
Auditorium & Exhibition Hall | Building A690 sq.m/roomNumber of room : 1 | Ceiling height = 7.7 mFloor with epoxy self-leveling 2.0 mm – thickFloor load = 750 kg/m2Maximum seating = 300 seats |
Meeting Room | Building C75 sq.m | Ceiling height = 3.5 mMax. seating = 32 seatsFlooring tilesFloor load = 300 kg/m2 |
Building F50 – 65 sq.mNumber of room : 3 | Ceiling height = 3.5 mMax. seating = 17 – 33 seatsFlooring tilesFloor load = 300 kg/m2 | |
Lecture Room | Building C120 sq.mNumber of room : 1 | Ceiling height = 3.5 mRubber floorFloor load = 300 kg/m2 |
Canteen | Building BSeating area 305 sq.mKitchen area 85 sq.m | Ceiling height = 3.5 mMax. seating = 180 seatsLPG gas cylinder storage areaoutside the buildingGranite floorFloor load = 300 kg/m2 |